Yarranlea Solar Farm will be developed in four stages on up to 250Ha of sparsely vegetated farmland approximately 50km west of Toowoomba. Once completed the project will have a generation capacity of up to 100MW, producing enough energy to power up to 32,000 homes. The project will connect to the power grid using the existing Ergon Energy infrastructure, located adjacent to the development site. This will allow transmission of power into Toowoomba via the Middle Ridge Bulk Supply Substation.
Yarranlea Solar farm will use the latest PV panel technology and integrated battery storage to allow it to supply power to the grid during periods of peak demand. The completed facility will have an operating life of 30 years, with the option for extensions. At the end of the facilities useful operating life, all physical infrastructure will be decommissioned and the land returned to its former agricultural use. This project is in its early stages of development with various impact and technical studies being completed for assessment by Federal, State and Local Governments. The Development Approval was lodged with Toowoomba Regional Council in July 2016 and was formally approved in December 2016. Detailed studies and plans for the project can be accessed in the following links.
Development Approval
- DOCS-#7222604-v1-Amended Plans Required to be Submitted for Approval 752 Murlaggan Road.PDF - 12/14/16
- DOCS-#7222599-v1-Approved Plans 752 Murlaggan Road.PDF - 12/14/16
- DOCS-#7222605-v1-Approved Document Site Rehabilitation and End Use Plan 752 Murlaggan Road.PDF - 12/14/16
- DOCS-#7222637-v1-Approved Document Land Resource Assessment and Management Pty Ltd 752 Murlaggan Road.PDF - 12/14/16
- DOCS-7330563-v1-Amended Negotiated Decision Notice 752 Murlaggan Road.pdf - 2/28/17
Appendices
- Appendix A - Development Plans.pdf - 11/17/16
- Appendix B - Council Code Assessment.pdf - 11/17/16
- Appendix C - State Code Assessment.pdf - 11/17/16
- Appendix D - Prelodgement Minutes with Council and State.PDF - 11/17/16
- Appendix E - Traffic Impact Assessment.pdf - 11/17/16
- Appendix F - Stormwater Management Assessment.pdf - 11/17/16
- Appendix G - Community Consultation.pdf - 11/17/16
- Appendix H - Ecological Assessment.pdf - 12/1/16
- Appendix I - Clearing Approval by DEE and DEHP.pdf - 11/17/16
- Appendix J - Visual Assessment.pdf - 11/17/16
- Appendix K - Glare Assessment.pdf - 11/17/16
- Appendix L - Agricultural Land Assessment.pdf - 11/17/16
- Appendix M - Public Notification Docs.pdf - 11/17/16
- Appendix N - Geotechnical Assessment.pdf - 11/17/16
- Appendix O - Electromagnetic Assessment.pdf - 11/17/16
- Appendix P - Ecological Response to Submissions.pdf - 11/17/16
- Appendix Q - Ecological Response to further RFI.pdf - 11/17/16
- Appendix R - Solar Panel Safety.pdf - 11/17/16
- Appendix S - Rehabilitation Plan.pdf - 11/17/16
- Appendix T - Lighting Assessment.pdf - 11/17/16
- Appendix V - Environmental Management Plan.pdf - 11/17/16